3-Phase Grid-Tied Inverter 40kW AFORE ATON BNT040KTL 2MPPT
Product code: ME6970
Shipping costs are not included in the price.
Shipping costs are not included in the price.
Shipping & Returns
Master Energy | Master Investment Sp. z o.o.
1. Right of Return (14 Days)
Individual consumers (B2C) have the right to withdraw from the contract and return purchased items within 14 calendar days from delivery without stating a reason.
2. How to submit a return or claim?
- 📧 E-mail: pv@masterenergy.eu
- 📞 Phone: +48 884 570 201
- 🏢 Registered Address: Master Investment Sp. z o.o., Rondo ONZ 1, 00-124 Warsaw, Poland (VAT ID: PL7010345632)
3. Complete terms and conditions
Detailed freight information, pallet shipping methods, and B2B commercial terms are available at our dedicated information page:
Payment methods
Instant Payments
You can pay for your order immediately using any available payment method. All payment data is encrypted and secured by an SSL certificate.
- Credit & Debit Cards – Visa and Mastercard, processed securely by Stripe.
- Apple Pay – convenient digital wallet checkout in one tap on Apple devices.
- Google Pay – seamless payment with stored cards in Google Wallet.
- BLIK – 6-digit code authorization (available for Polish transactions).
- PayPo – buy now, pay in 30 days or in flexible installments.
- Klarna – buy now, pay in 30 days without extra fees.
- Instant Bank Transfer – automated bank transfer through PayU.
- PayPal – secure multi-currency payment directly from your PayPal account.
Traditional Payments
- Bank Transfer – direct wire transfer to our bank account. Proforma invoice and details are sent by email.
- Cash on Delivery – pay the courier upon package delivery (maximum 10,000 PLN per order).
Installments
PayU Installments – split your order into manageable monthly payments with an instant online application process.
Ask about the product
Administratorem danych osobowych jest Master Investment sp. z o.o.. Przetwarzamy je w celu przesłania odpowiedzi na zapytanie. Więcej informacji dotyczących przetwarzania danych osobowych znajduje się w polityce prywatności.
Description
AFORE ATON BNT040KTL 2MPPT Grid-Tied Inverter is a three-phase string inverter designed for commercial installations and photovoltaic power plants. The BNT040KTL model has a nominal output power of 40 kW and is designed for high efficiency, great mechanical durability, and a wide MPPT operating range, allowing efficient operation with PV systems with a maximum DC power of up to 60 kW.
Manufacturer Information
Afore (Afore New Energy Technology) is a manufacturer of PV inverter and energy storage solutions based in Shanghai (China). The company offers a wide range of single-phase and three-phase inverters as well as energy storage systems; its products are used globally in residential, commercial, and power plant projects.
Main Electrical and Technical Parameters
- Max. DC Power: 60 000 W
- Max. DC Voltage: 1100 V
- MPPT Voltage Range: 200 - 1000 V
- Rated Input Voltage: 620 V
- Start-up Voltage: 200 V
- Nominal Output Power: 40 000 W
- Max. Output Power (VA): 44 000 VA
- Nominal Output Current: 48 A
- Frequency / Grid: 50/60 Hz (compliance with local standards)
- High MPPT / Overall Efficiency: very high (premium class efficiency values in the manufacturer's table)
Mechanical Parameters
- Protection Degree: IP66 (housing designed for outdoor use and harsher conditions)
- Dimensions (approx. from catalog): 710 x 470 x 236 mm (physical variants of the 30–60 kW series: 450 x 485 x 210 mm and 710 x 470 x 236 mm — for higher powers, the larger variant is typically used)
- Weight (approx.): ~51 kg (for the larger variant 30–60 kW; smaller variants of the series may weigh ~26 kg)
- Housing: aluminium, anodized (unibody for the BNT series)
- Cooling: intelligent fan (intelligent fan cooling) / cooling system designed for continuous operation
Note: the presented parameters are directly based on the catalog data of the BNT series (model BNT040KTL). When designing installations and selecting protections, always refer to the full manufacturer's documentation and local grid requirements.
Customer reviews
If you've added a review and it doesn't appear on the list, it may be pending moderation.